Scope of Work: Executed manufacturing and installing mechanical, electrical and civil works for lime stone Belt conveyor #17 with a length of 300 m at the Suez Cement plant, Where we manufactured and installed frame of B.C & Supports bases for belt conveyor along distance 300 m, Reconnection the electrical cables & adjust the civil bases. as a result of its torrent from the rain. The work was completed in 144 hours only