Scope of Work: Steel Cord Belt Conveyor with length 900 m – Katameya Cement Plant.
Once again, Menco for Industrial Projects engage an emergency repair and manufacturing process for stone conveyor by length 900 m. Civil works were carried out as the soil was rebuilt and the concrete bases rebuilt again.
Fabrication and installation all the mechanical work of the 900-meter stone belt conveyor – steel cord. As a result of its collapse from the waters of the dams surrounding the region, within 10 days