Scope of Work: We executed an emergency repairs, mechanical and electrical installations and civil works for lime stone steel cord Belt conveyor with a length of 500 m at the Kattameya Cement plant, as well as the maintenance operation on the belt conveyor as a result of its destruction from the collapse of the water dam. The work was completed in 130 hours only