The project concerns of the replacement of new two shell sections for Kiln#2
replacing the following two shell section:
➢ The Outlet heavy section under tyre#3 with cooling jacket 9080 mm, the section to be replaced is located between meter 0 and meter 9.080 from outlet .
➢ The shell section 18600 mm(2 pieces 8990 mm&9610 mm to be assembled at site pre shutdown ) between girth gear to tyre 2, the section to be replaced is located between meter 34 to meter 52 from Kiln outlet .
Duration : 24 days